THE Metropolitan Manila Development Authority (MMDA) has proposed the construction of rainwater impounding facilities inside Camp Aguinaldo to ease recurring flooding on EDSA, with the proposed design released on Wednesday, Aug. 27.
The plan requires detention ponds that will temporarily store excess rainwater during downpours and gradually release it into the EDSA drainage system, leading to the Makiling Creek.
As proposed, the project will be implemented in three phases, covering 182 hectares and involving a golf course near Gate 2, another near Gates 3 and 4, and an open space near Gate 6.
For the first phase near Gate 2, the detention pond has a 361-meter perimeter, a 4,650-square-meter area, an 8-meter depth, and a 37,200-cubic-meter capacity, designed for a 25-year return period (15.6 mm per hour over 24 hours), exceeding the needed 36,945 cubic meters.
MMDA’s schematic shows that under normal weather, the water bypasses the pond and flows through the lagoon to EDSA.
MMDA proposes rainwater facilities in Camp Aguinaldo to mitigate EDSA flooding
During heavy rain, floodgates divert water flow into the pond; after rain, pumps discharge stored water slowly into EDSA toward the Makiling Creek.
The scope of works covers the impounding area, operations and powerhouse, drainage and electromechanical works, and landscaping and golf course restoration, with a treatment facility under consideration., This news data comes from:http://aichuwei.com

Officials said operations and maintenance arrangements, and a memorandum of agreement, are still under discussion.
- 'New' position being offered to Torre — Palace
- Head of main US health agency abruptly dismissed
- Tax bureau hunts down contractors over questionable flood control deals
- Corruption crackdown: VP Sara Duterte, lawmakers call for deeper probe into government
- 9 dead in Ecuador after bus plunges into ravine
- DPWH chief rejects calls to resign as he vows to probe corruption in flood control projects
- Iran-backed Houthis raid UN offices in Yemen and detain at least 11 employees
- Inflation up 1.5% in August
- South Korean President vows support to Koreans arrested in US immigration raid
- HEADLINES: DPWH fires Bulacan engineers, blacklists contractors over anomalous projects | Sept. 5, 2025